We’ll head back to the alley behind the Barton St. P-Patch to finish removing the blackberry overgrowth. Last week we probably got 75% of the material cut out and hauled off. This time we’ll remove the remaining brambles, go after the roots and find the edge of the concrete under the accumulated dirt to widen the alleyway.
This will be a fun before & after as the blackberries and overgrowth along both sides of the alley ate up a lot of usable space. It will feel like a brand new day back there once we get it all removed.